Project construction strong support water infrastructure development

2011-09-29 09:46

The "eleventh five-year plan" period, QingShuiXian grasp the country to expand domestic demand new central investment, after-disaster reconstruction and guanzhong-tianshui economic zone construction policy opportunity, closely around mineral, fruit, livestock and poultry, pollution-free vegetables, green Chinese herbal medicine, and other competitive industries development, carry out the project impetusing strategy, and actively introduce the xin Ye chemical, yuan paper, tianshui weiye, a key, and a number of industrial projects for investment promotion, and built the traffic, urban construction, water conservancy, electric power and social undertakings and a number of major national investment project, pull the county to fast economic growth. By the end of 2010, a total of 495 items each kind of project implementation, completed investment of 6.009 billion yuan; Try to carry out project fund 1.749 billion yuan, is the "" period of 4.28 times. Through the project construction driven, and the total investment in the fixed assets 6.682 billion yuan, is the "" period of 8.97 times.

Transportation conditions improved obviously. The implementation of railway HeZhuang day start scales highway traffic project for water major, wrote the new chapter of JiaoTongShi water. Qing club highways are built, get through the use of traffic "south export". Total investment of 275 million yuan, using the hydraulic system implementation in engineering, the flow of new roads within the article 137, reformed, 901.38 km, new, rebuilding highway traffic a total length of 1049.6 kilometers, is "15" increased at the end of the 282.19 km. The county level 2 passenger stations built, triple freight station and 8 towns, 52 bus stop village, 18 villages and towns all the oil or cement road, transportation network gradually improved.

The rural infrastructure construction works well. Implementing the km road and the village school of the "" project, hardening built 125000 mu, high quality terrace reinforcement levee 37.24 km, built YongQing town, wei jia tableland comprehensive agricultural development and lower-yield fields demonstration area. The new town, gold set and the king shop and so on drinking water safety engineering in 18, solve the township 106 15 village of 105200 rural people drinking water safety problems. Not 13000 households farmers to use the "a pool three methane, grinding small hydropower station king constructed and put into use, electrification county through the provincial acceptance. Combined with air moving and after-disaster reconstruction project and moving out new and all rules TongJian village of 88 rural residents, construction of housing 17000, and the new practice 16611 houses.

 

(wow gold) https://www.wow-gold-team.com (buy wow gold)

(buy diablo 3 gold) https://www.myd3gold.com (diablo 3 gold)

(wow gold) https://www.wow77.com (buy wow gold)